top of page
< Back
Unit 4-5, Ensign, Purfleet, RM19

Unit 4-5, Ensign, Purfleet, RM19

Refurbishment and Electrical Works

•Installation of emergency lighting throughout
•Complete LED upgrade to lighting throughout
•NICEIC 5-year fixed wiring inspection of the premises
•Installation of new kitchenette
•Concrete repairs to the warehouse slab floor, preparation and application of reinforced latex basecoat
•Application of Watco high build epoxy gloss resin in Goosewing grey
•Refurbishment of front entrance door including letter box
•Refurbishment of warehouse shutter

 Prestige Group Limited - 2021© 
                       
bottom of page